Background Image
Table of Contents Table of Contents
Previous Page  94 / 98 Next Page
Information
Show Menu
Previous Page 94 / 98 Next Page
Page Background

For equipping of rail-grinding machines SChR and SChR-A

“Kalugaremputmash” at processing

of street railway tracks.

For equipping of rail-grinding trains RShP-112 at processing

of thermo-strengthened rails.

D,

mm

H,

mm

d

The plant receives the orders of wheels manufacturing with dimensions and characteristics

not indicated in the given table.

T,

mm

D,

mm

H,

mm

d

T,

mm

150

150

150

51

51

56

М6

М8

М8

4

4

4

6400

6400

6400

63

63

73

A 36 P B

A 36 P B

A 16 Q B

2.630

2.630

2.908

150

56 М6; М8

4

5100

73

A 36 Q B

2.811

D

H

d

x

4

T

B,

mm

86

L,

mm

394

48

150

H,

mm

A 16 Q B

10.507

Type 9S

L

B

H

Segments

40m/

s

50m/

s

STEEL

The plant receives the orders of wheels manufacturing with dimensions and characteristics

not indicated in the given table.

94

Type 36

STEEL

Working speed,

RPM

Characteristic

Weight,

kg

Working speed,

RPM

Characteristic

Weight,

kg

Characteristic

Weight,

kg